hebel. today · 25 November 202667 / 79

Sport · Sports Analytics

Quantifying operational waste in team workflows

An audit of a 40-hour workweek for a hypothetical SDR reveals 18 hours of gross prospecting, yet only 14 hours qualify as productive after removing research, preparation, and administrative tasks. This breakdown identifies six…

An audit of a 40-hour workweek for a hypothetical SDR reveals 18 hours of gross prospecting, yet only 14 hours qualify as productive after removing research, preparation, and administrative tasks (Outbound Kitchen). This breakdown identifies six hours of total waste, including two hours spent on known bad numbers and two hours on data that requires re-verification. Leadership can categorize these losses by frequency and impact, such as allocating one hour to redundant research already performed elsewhere in the team or one hour to manual CRM entries that duplicate existing records.

Teams improve operational efficiency by establishing precise baselines before implementing changes, as leadership often struggles to track cycle time from request to launch because the clock starts in informal channels like meetings or email. When reviewing workflow performance, a non-private example of an unclear timing metric allows a team to define a measurement boundary and produce a repeatable report (LerLer Chan from Ler Tech Notes). This reporting principle emphasizes inspecting the specific observations that an aggregate mean can hide, such as five explicitly known slow values that skew a distribution.

Try today · 30 min

Audit one team member's workweek to categorize productive hours versus waste.

List every task performed last week and assign it to a category: productive prospecting, research, administrative overhead, or known waste.

You need

  • A list of tasks performed by one team member over the last 40-hour week
  • A spreadsheet or document for categorization

Steps

  1. Define the measurement boundary for what constitutes productive work versus administrative overhead.
  2. Assign each hour of the 40-hour workweek to a specific category.
  3. Count the minutes spent on known invalid tasks or redundant data entry.
  4. Calculate the total hours of waste found during the week.
  5. Identify the single most frequent bottleneck affecting the team member's output.

One email instead of your newsletter pile.

Forward the newsletters you already get (a Gmail filter does it) and tell Hebel your goals. Every morning it reads them with 20,000 others and sends one short email, with one small thing to do today. Fewer emails, not more. Free during beta.

Start my paper →
LinkedIn X

Sources

  1. Outbound Kitchen on hebel. →This audit framework provides a method to split a 40-hour workweek into productive prospecting and specific categories of operational waste.

  2. LerLer Chan, Ler Tech Notes on hebel. → ✎ Written by a personThe reporting principle section details why aggregate averages hide distribution tails and how to define measurement boundaries for performance.

Sports Analytics yesterday

Managers trap expertise in bottlenecks

Sign in to Hebel first

Likes, your collection and done Hebel need an account. We email you a six digit code; no password.