hebel. today · 18 November 202646 / 80

Business · Energy and Infrastructure

Data centers and the physical cost of digital growth

Quantifying digital resource consumption. Researchers from the Harvard T.H. Chan School of Public Health tracked 403 large U.S. data centers, finding they consumed 68–99 terawatt-hours of electricity between May 2024 and April 2025. This…

Quantifying digital resource consumption. Researchers from the Harvard T.H. Chan School of Public Health tracked 403 large U.S. data centers, finding they consumed 68–99 terawatt-hours of electricity between May 2024 and April 2025 (Jack Myers from The Myers Report). This usage accounts for 1.8% of total U.S. electricity demand, with fossil fuels providing 54% of that power (Jack Myers from The Myers Report). Beyond energy, human activity physically reshapes coastal environments; bathymetric mapping of 2,500 kilometres in the Venice Lagoon revealed pervasive dredging marks and scours caused by ship traffic and protective infrastructure (EarthStuff).

Building systems for accountability. David McNair’s Development Finance Observatory uses code to pull debt service figures from the World Bank and health expenditure from the WHO to calculate spending per person in under two minutes (David McNair). This infrastructure allows analysts to generate malaria funding briefings by mapping incidence against expenditure through Claude’s MCP server. Meanwhile, the UN defines the triple planetary crisis as the intersection of climate change, biodiversity loss, and pollution, noting that resource extraction for green technologies often reproduces these destructive patterns (Mesoscale News with Rebekah Jones).

  • The 1997 Kyoto Protocol introduced binding emissions targets for developed countries, establishing a framework for global climate governance (Mesoscale News with Rebekah Jones).
  • Alexander Hamilton’s 1790 institutional reforms helped trade U.S. bonds above par by 1791, demonstrating the impact of transparent public finance (David McNair).

Try today · 30 min

Map the specific resource-intensity of your primary business process by creating a two-column balance sheet.

List every input (electricity, water, raw materials) on the left and the corresponding output or service value on the right.

You need

  • Process documentation
  • Spreadsheet or ledger

Steps

  1. Identify the primary output of your business process.
  2. List all physical inputs required for one unit of that output.
  3. Assign a quantitative unit to each input (e.g., kWh of electricity).
  4. Trace the origin of the largest input to its physical source.
  5. Record the ratio of input to output to establish a baseline.

One email instead of your newsletter pile.

Forward the newsletters you already get (a Gmail filter does it) and tell Hebel your goals. Every morning it reads them with 20,000 others and sends one short email, with one small thing to do today. Fewer emails, not more. Free during beta.

Start my paper →
LinkedIn X

Sources

  1. Mesoscale News with Rebekah Jones on hebel. →This article details the triple planetary crisis and the limitations of current international climate governance agreements.

  2. David McNair on hebel. →This piece explains how double-entry bookkeeping and modern data infrastructure enable transparent tracking of public finance.

  3. Jack Myers, The Myers Report on hebel. → ✎ Written by a personThis report provides the specific electricity consumption and carbon emission figures for 403 large U.S. data centers.

  4. EarthStuff on hebel. →This study uses 2,500 kilometres of bathymetric mapping to document the physical impact of human infrastructure on the Venice Lagoon floor.

More in Business

Public launches fail to drive initial revenue

Negotiating from a position of structural leverage

Automating governance as code scales

Delegating operational control versus maintaining founder oversight

Headline valuations mask the dilution hidden in cap tables

Energy and Infrastructure yesterday

Digital infrastructure faces a physical reckoning

Sign in to Hebel first

Likes, your collection and done Hebel need an account. We email you a six digit code; no password.